New Build, Machine Shop, Crawley

This was a new build warehouse to replace an existing building that was out of date. We installed a new 200 amp supply to the new warehouse and installed a new TPN distribution board.

We installed high level metal trunking round the perimeter of the warehouse with trunking drops in the relevant place to supply the machinery. Each supply point has a three phase supply and a single phase supply to allow the electrical installation to be flexible to different types of machinery.

High level lighting trunking was installed with fluorescent fitting’s spread across the phase’s to reduce the stroboscopic effects.